daune

Recent large claims paid

Top large paid claims:

• Performance Bond – Non-Performance of reconditioning works at a Transylvanian factory/ March 2015/ Paid EUR 868.000

• Performance Bond – Non-performance of repair work to Bucharest sewage system / April 2013 / Paid: EUR 705.000

• Property damage – Total loss of 2 large loading cranes during a severe storm in Constanta / April 2012 / Paid: EUR 2.950.000

• Performance Bond – non-performance of repair work in Giurgiu / May 2014/ Paid: USD 450.100

• Marine Hull – Engine room flooding / January 2014 / USD 1.002.400

• Marine Hull – Total loss fire damage / July 2012 / Paid: USD 2.217.094

• Terminal Operator Liability / April 2013 / Paid: USD 256.000

 


Petitions/complaints lodged against the company CERTASIG SA and lodget with the Financial Supervisory Authority last 3 months are total of 0 (zero). Their structure can be found by visiting the dedicated page here

This window will close in 5 seconds.